TAWAM DIALYSIS CENTRE

PROJECT DATA

Contract value: AED 27.5 million

Contract duration: 13 months

Client: SEHA

Consultant: Allen & Sheriff/Burt Hill

Main contractor: Civil Power General Contracting LLC

Completion date: 2015


This facility comprises a total of 68 private dialysis stations with expansion space to accommodate up to 90 private dialysis stations. The Dialysis Centre in total is approximately 9,500 square meters, which includes the dialysis stations, training and education facilities as well as administrative and support space.

Trans Gulf supplied the following:

Fire Fighting

  • Fire pump x 1 - diesel & electric pump of capacity 1000 GPM @ 10 bar
  • RCC fire water tank x 1 of capacity 60,000 US gallons
  • Sprinkler x 2000
  • Alarm check valve x 2
  • 21/2” landing valve with 30m long hose x 22
  • 1” hose reel with 30m long hose x 22
  • Wet barrel fire hydrant x 2
  • 6kg DCP & 5kg CO2 fire extinguisher set x 22
  • Gas flooding system x 8 rooms

Fire Alarm System

  • Fire alarm control panel x 1
  • Smoke detector x 480
  • Duct smoke detector x 8
  • Heat detector x 15
  • Strobe x 70