John Doe 20

LANDMARK GROUP HEADQUARTERS

PROJECT DATA

Contract value: AED 56 million

Contract duration: 26 months

Client: Landmark Asset Holdings

Consultant: Archgroup

Main contractor: Shapoorji Pallonji International FZE

Completion date: June 2016


This building comprises of 1 U/G basement (storage tanks & plant room), 3 basement floors car parking, ground floor (entrance lobby/DG room/substation/security room), 7 podium car parking, 19 floor offices and 4 roof floors (MEP Plant Rooms).

The total built up area is 1,170,000 sq. ft.

Fire Fighting

  • Fire pump – 1 x diesel pump & electric pump of capacity 1000 GPM @ 18 bar & 1 x diesel pump & electric pump of capacity 1000 GPM @ 14 bar
  • RCC fire water tank x 2 of capacity 60,000 US gallons
  • Sprinkler x 22,000
  • Alarm check valve x 4
  • 21/2” landing valve with 30m long hose x 200
  • 1” hose reel with 30m long hose x 200
  • Deluge valve x 3
  • 6kg DCP & 5kg CO2 fire extinguisher set x 200
  • Foam system for generator rooms
  • Pre-action system for lift machine room
  • FM 200 gas flooding system x 7 rooms

Fire Alarm System

  • Fire alarm control panel x 6
  • Photo electric smoke detector x 3130
  • Heat detector x 50
  • Strobe x 227
  • Speaker/sounder x 269

Emergency Lighting System

  • Central battery panel x 2
  • Emergency light x 2455
  • Exit light x 807