PROJECT DATA
Contract value: AED 78 million
Contract duration: 13 months
Client: Emirates Flight Catering
Consultant: io consultants/ KEO
Main contractor: Laing O’Rourke
Completion date: Jan 2017
The project consists of a main building, elevated car park deck, staff screening building, office building on the roof of the existing EKFC-1 facility and link bridge. The total built up area is 25,896 sq. m.
Trans Gulf Electromechanical was awarded the complete project and has executed the scope for HVAC, electrical & ELV systems and plumbing and drainage services.
Fire Fighting
- Fire pump x 1 - diesel & electric pump of capacity 1000 GPM @ 10 bars
- RCC fire water tank x 1 of capacity 60,000 US gallons
- Sprinkler x 1500
- Alarm check valve x 2
- 21/2” landing valve with 30m long hose x 25
- 1” hose reel with 30m long hose x 25
- 6kg DCP & 5kg CO2 fire extinguisher set x 25
Fire Alarm System
- Fire alarm control panel x 2
- Smoke detector x 580
- Duct smoke detector x 17
- Heat detector x 177
- Multi sensor detector x 8
- Strobe x 142
Emergency Lighting System
- Central battery panel x 2
- Emergency light x 645
- Exit light x 114